检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗干生 LUO Gansheng(Ningbo Urban Infrastructure development Center,Ningbo 315000,China)
机构地区:[1]宁波市城市基础设施建设发展中心,宁波315000
出 处:《交通与运输》2022年第5期49-52,共4页Traffic & Transportation
摘 要:为了在城市快速路高架建设过程中减少工程投资,减少资源浪费,实现快速化施工,研究探讨了更符合工程投资及快速化施工需求的设计方案。以宁波某快速路高架工程为例,罗列比选传统方案与推荐方案之间的优缺点,在完成功能目标的大前提下,探讨可以实现节约造价和快速化施工两大目标的方案。为类似工程提供样板与设计思路,更好地服务于城市快速路高架建设的成本控制和快速化施工。In order to reduce project investment,reduce resource waste and realize rapid construction in the process of elevated construction of urban viaduct,this paper puts forward some discussions on a design which is more in line with project investment and construction needs.Taking an urban viaduct project in Ningbo as an example,the advantages and disadvantages are listed between the traditional schemes and the recommended schemes.On the premise of achieving the functional objectives,the schemes are discussed which can achieve the two goals of cost saving and rapid construction.The relevant design schemes are found which can provide a model and design ideas for similar projects and better service in the cost control and rapid construction of urban viaduct.
分 类 号:U491[交通运输工程—交通运输规划与管理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49