龙塘水闸枢纽生态鱼道过鱼孔断面设计优化  

Optimization of fish hole cross-section design for ecological fish way of Longtang Sluice Complex

在线阅读下载全文

作  者:熊晖 李小五[1] 黄康鑫 XIONG Hui;LI Xiao-wu;HUANG Kang-xin(China Water Resources Pearl River Planning,Surveying and Designing Co.,Ltd.,Guangzhou 510610,China;Guangxi Water&Power Design Institute Co.,Ltd,Nanning 530023,China)

机构地区:[1]中水珠江规划勘测设计有限公司,广州510610 [2]广西水利电力勘测设计研究院有限责任公司,南宁530023

出  处:《广西水利水电》2022年第5期47-51,共5页Guangxi Water Resources & Hydropower Engineering

摘  要:介绍了龙塘水闸枢纽工程生态鱼道工程的局部水工模型试验。主要目的为研究鱼道过鱼孔断面设计的合理性,并在初步设计方案的基础上进行调整和优化,为鱼道整体模型试验及鱼道设计提供支撑。An introduction was made on the local hydraulic model test for the ecological fish way structure of Longtang Sluice Complex. The test was carried out mainly for study of the rationality of fish hole cross-section design, adjustment and optimization of the preliminary design scheme, providing support for overall model test and design of fish way.

关 键 词:生态鱼道工程 水工模型试验 过鱼孔断面设计 龙塘水闸枢纽 

分 类 号:S956.3[农业科学—水产养殖]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象