检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周炯 Zhou Jiong(General Research Institute of Architecture&Planning Design Co.Ltd.,Chongqing University,Chongqing 400045;Chongqing University,Chongqing 400045)
机构地区:[1]重庆大学建筑规划设计研究总院有限公司,重庆400045 [2]重庆大学,重庆400045
出 处:《江西建材》2022年第8期348-349,352,共3页Jiangxi Building Materials
摘 要:重庆市江北城CBD区域江水源热泵三期工程取水工程规模为17200m3/h,针对工程用地受限、场地内建构筑物复杂、嘉陵江水位和含沙量随季节变化以及三峡库区运行变动幅度大等问题,文中首创性采用“一级取水泵+二级过滤+二级加压泵”的闭式直流串联供水系统,通过多种合理优化设计,实现了节约用地、高效节能、与周边有机融合的目标。The scale of the water intake phase III project for central cooling and heating project in Jiangbeicheng CBD area of Chongqing is 17200 m3/h. Several problems increase the difficulty of engineering design, including limited project land and complex Buildings and structures in the site. In addition, the water level and sand content of Jialing River vary greatly with seasonal variation and the operation of the Three Gorges Reservoir, also bring difficulties to technological design. The closed continuous flow water supply system of "primary water pump + two stage filtration + secondary water pump" is firstly applied in similar project. After reasonable optimization design, this project has achieved the goals of land conservation, high efficiency and energy conservation, and organic integration with the surrounding areas.
关 键 词:江水源热泵 取水工程 闭式直流串联供水系统 多级过滤 纵深利用
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40