检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈赟 吴寒[2] Chen Yun;Wu Han(Anyuan County Water Conservancy Bureau,Ganzhou,Jiangxi 342100;School of Engineering and Construction,Nanchang University,Nanchang,Jiangxi 330000)
机构地区:[1]江西省赣州市安远县水利局,江西赣州342100 [2]南昌大学工程建设学院,江西南昌330000
出 处:《江西建材》2022年第8期380-382,共3页Jiangxi Building Materials
摘 要:为了降低水利工程施工阶段的环境影响,文中提出了水利工程施工环境风险评价指标体系和评价模型。首先,利用风险分解结构分析并构建水利工程施工环境风险评价指标体系;其次,借助直觉模糊层次分析法的隶属度、非隶属度和犹豫度概念,充分考虑水利工程施工环境风险评价中的确定性、不确定性和犹豫性;最后,将评价指标体系和评价模型运用于安远县永镇水库工程,结果表明,最重要的施工环境风险为水资源影响,为该项目加强环境管理提供了参考。To reduce the environmental risk of hydraulic engineering construction, an index system and evaluation model were put forward.Firstly, the risk breakdown structure was used to analyze and construct the evaluation index system. Then, by membership degree, nonmembership degree, and hesitation degree of intuitionistic fuzzy analytic hierarchy process, the certainty, uncertainty and hesitation in environmental risk assessment were fully considered. Finally, the proposed evaluation index system and evaluation model were applied to Yongzhen Reservoir Project in Anyuan County. The results showed that the most important construction environmental risk was the impact of water resources, which provided insights for the project to strengthen environmental management.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145