深圳前海某地块海绵城市建设目标实现途径初探  

Study on the Realization Ways of Sponge City Construction Goal in Qianhai Cooperative District in Shenzhen

在线阅读下载全文

作  者:刘元元 LIU Yuanyuan(Henan Water&Power Engineering Consulting CO.LTD.,Zhengzhou 450016,China)

机构地区:[1]河南省水利勘测设计研究有限公司,河南郑州450016

出  处:《河南水利与南水北调》2022年第8期3-4,共2页Henan Water Resources & South-to-North Water Diversion

摘  要:海绵城市作为中国新一代雨洪管理系统,逐步应用于全国各大城市建设中;建设目标作为海绵城市实施的首要任务,其实施途径还未完全成熟。文章以深圳前海合作区某地块为例,对其年径流总量控制率、雨量综合径流系数及径流污染负荷率等建设目标的实现途径进行探讨,并归纳总结出“WSFM”实施方案,即“加权平均法+软件模拟法+公式法”。此外,还对海绵城市建设目标实施的可行性进行了分析,为前海合作区海绵城市建设顺利进行提供了理论依据。Sponge city is a new generation of stormwater management system in China,and is gradually applied in the urban construction.Implementation of construction goal is the primary task of the sponge city,but the implementing way is not fully mature.This paper takes the example of Qianhai cooperative district of Shenzhen and discusses the methods of achieving the target of constructing a sponge city.The study takes into account the total annual runoff,comprehensive rainfall runoff coefficient,and runoff pollution load rate,and summarizing the WSFM implementation plan,which is the weighted average method,software simulation method and formula method.In addition,this paper also analyzes the feasibility of sponge city construction goals,which provides the theory basis for the sponge city construction in Qianhai cooperative district.Meanwhile,the implementation plan can provide reference for other cities solving the problem of sponge city construction goal in the future.

关 键 词:海绵城市 年径流总量 径流污染物 

分 类 号:TU992[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象