检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金瑞芳 JIN Ruifang(Qingdao West Coast New Area Water Development Center,Qingdao 266500,China)
机构地区:[1]青岛西海岸新区水务发展中心,山东青岛266500
出 处:《河南水利与南水北调》2022年第8期87-88,共2页Henan Water Resources & South-to-North Water Diversion
摘 要:在调蓄水工程管道试压方法的基础上,以泗河流域尼山水库调蓄水工程为例,对管道试验方式、试压参数及试压过程进行了分析探讨。结果表明,钢管与PCCP混合输水管道水压试验是对管道接口、管材及施工质量所展开的全面检查,通过试压过程控制,能有效避免试验压力突变所造成的测试管道管件及阀门损坏,提升安全系数,增强稳压效果。On the basis of summarizing the pipeline pressure test method of water regulation and storage project,the pipeline test method,pressure test parameters and pressure test process are analyzed and discussed in this paper by taking the water regulation and storage project of Nishan Reservoir in Si River Basin as an example.The results show that the hydraulic pressure test of steel pipe and PCCP mixed water delivery pipeline is a comprehensive inspection of the pipeline interface,pipe material and construction quality.Through the control of the pressure test process,it can effectively avoid the damage of the test pipe fittings and the valves caused by the sudden change of test pressure,improve the safety factor and enhance the pressure stabilizing effect.
关 键 词:尼山水库调蓄水工程 钢管 PCCP混合管道 试压
分 类 号:TV6[水利工程—水利水电工程] TU7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.229.13