检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄本良 HUANG Benliang(Shanghai Underground Space Architectural Design&Research Institute Co.,Ltd.,200125,Shanghai,China)
机构地区:[1]上海市地下空间设计研究总院有限公司,上海200125
出 处:《城市轨道交通研究》2022年第10期154-158,共5页Urban Mass Transit
摘 要:城市核心区多层次开发的立体地下空间,由于开发时序的不同,存在先期实施的地下空间与预留的后期城市轨道交通较难平衡的实际问题。以郑州市双鹤湖片区核心区地下空间的总体设计为例,阐述了地下空间先期开发需综合考虑远期地铁线路、区间、车站的预留,同时应提前防范后期地铁的实施对地下空间的影响等相关问题。In the multi-level development of three-dimensional underground space in urban core area,due to the different temporal sequences of development,it is difficult to balance the underground space constructed in the early stage and the reserved urban rail transit in the later stage.Taking the overall design of underground space in the core area of Shuanghehu area in Zhengzhou City as an example,related issues are expounded,such as the need to comprehensively consider the reservation of long-term metro lines,intervals and stations in the early development of underground space,and the need to prevent the influence of metro later stage construction on developed underground space.
分 类 号:TU984.113[建筑科学—城市规划与设计] TU92
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3