检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:闫秋吉 Yan Qiuji
机构地区:[1]北京全路通信信号研究设计院集团有限公司,北京100070
出 处:《铁道通信信号》2022年第9期50-53,共4页Railway Signalling & Communication
摘 要:针对高速道岔转换过程中尖轨存在不足位移的问题,提出弹簧推力辊轮(STR)装置。介绍了STR装置的结构组成、安装方式、工作原理和动作过程等;通过受力分析和试验验证,表明STR装置可有效减小密贴尖轨在道岔转换过程中的不足位移,可应用于整治高速铁路大号码道岔尖轨不足位移。To deal with scant displacement of the switch rail during the switching of high-speed turnout,the spring thrusting roller(STR)device was presented.The composition,installation method,working principle and action process of the STR are described.Through force analysis and test verification,it has been demonstrated that the STR could effectively reduce scant displacement of the closed switch rail in the switching course of the turnout and can be applied to reducing scant displacement of high-speed railway large-number turnout.
关 键 词:弹簧推力辊轮(STR)装置 道岔 密贴尖轨 斥离尖轨 不足位移
分 类 号:U284.5[交通运输工程—交通信息工程及控制]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68