检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《住宅产业》2022年第9期80-83,共4页Housing Industry
摘 要:为加大对土地资源的利用和满足使用要求,越来越多的住宅或者办公楼设置多层地下室,基坑深度达到10米以上,与之相对应的,基坑支护设计需要设置支撑梁等措施来满足深基坑支护的受力要求。深基坑地下室的施工组织需考虑支撑梁的影响。本文以某深基坑项目的地下室施工组织为例,分析支撑梁与地下室施工组织的关系,通过优化施工组织、减少工作面闲置和人员窝工,达到提高经济效益的目的,供类似项目借鉴。In order to increase the use of land resources and meet the use requirements,more and more residential or office buildings are equipped with multi-storey basements,and the depth of the foundation pit often reaches more than 10 meters.Correspondingly,the design of foundation pit support often needs to set up support beams and other measures to meet the stress requirements of deep foundation pit support.The influence of supporting beam should be considered in basement construction organization of deep foundation pit.This paper takes the basement construction organization of a deep foundation pit project as an example,analyzes the relationship between the support beam and the basement construction organization,so as to optimize the construction organization,reduce the idleness of the working time and personnel,and then improve the economic benefits,which can be used for reference by similar projects.
分 类 号:TU753[建筑科学—建筑技术科学] TU94
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49