浅谈普速铁路曲线区段接触网拨复网方法  

Discussion on the Method of Catenary Pulling Out and Reconnecting in Curve Section of Ordinary Speed Railway

在线阅读下载全文

作  者:陈志勇 CHEN Zhiyong(China Railway Nanning Bureau Group Co.,Ltd Liuzhou Power Supply Section,Liuzhou 545007,China)

机构地区:[1]中国铁路南宁局集团有限公司柳州供电段,广西柳州545007

出  处:《铁道运营技术》2022年第4期10-12,共3页Railway Operation Technology

摘  要:在普速铁路曲线区段配合事故救援,需对接触网进行拨复网工作,针对拨复网过程中遇到的困难,提出减少张力、同步卸载和使用滑轮组的优化方案,在做好安全卡控的同时,极大限度地减少了拨复网时间。In order to cooperate with accident rescue in curve section of ordinary speed railway,it is necessary to pull out and restore the catenary.In view of the difficulties encountered in the process of pulling out and restor⁃ing the catenary,an optimization scheme for reducing tension,synchronous unloading and using pulley block is proposed,which greatly reduces the time of pulling out and restoring the catenary while doing a good job of safety monitoring.

关 键 词:曲线 事故救援 拨移 复网 

分 类 号:U225[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象