检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘洋[1] 李春阳 乔梁[1] LIU Yang;LI Chun-yang;QIAO Liang(CCCC-FHDI Engineering Co.,Ltd.,Guangzhou 510290,China)
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510290
出 处:《水运工程》2022年第10期110-114,共5页Port & Waterway Engineering
摘 要:码头前沿作业地带是集装箱码头港区装卸作业最繁忙的区域,其场地的整体稳定性是保证港区作业效率的重要因素之一,也是降低自动化集装箱码头运营时期智能设备维护成本的主要基础。然而,以重力式结构形式为主体的集装箱码头前沿作业地带通常存在两个质量通病:一是岸桥两轨之间区域“凹陷”现象,二是岸桥陆侧轨“突出”现象。近年来,随着交通建设由追求速度、规模向注重品质、效益转变,重力式码头前沿作业地带堆载预压技术的应用逐步增多,从而为重力式码头后方抛石棱体密实沉降研究提供了更多的验证数据,也可较好地解决岸桥两轨间积水导致自动化水平运输设备视觉感应受干扰、水平运输设备在岸桥陆侧轨跳车等系列质量通病。The apron operation area is the busiest area for loading and unloading operations in the container terminal.The overall stability of the site is one of the important factors to ensure the operation efficiency of the port.For automated container terminals,it is also the main factor to reduce the maintenance cost of intelligent equipment.However,in the container terminal with gravity structure,there are two common quality problems in the apron operation area,one is the phenomenon of‘sag’in the area between the two rails of the quay crane,and the other is the phenomenon of‘protruding’of the land side rail of the quay crane.In recent years,with the transformation of transportation construction from pursuing speed and scale to focusing on quality and efficiency,the application of surcharge preloading technology provides more verification data of the compact settlement of the rock mound,and can also better solve the series of quality problems,such as the disturbance of visual sensing of the automated horizontal transportation equipment caused by the accumulation of water,and the jumping of the horizontal transportation equipment on the land side rail of the quay crane.
关 键 词:重力式码头 码头前沿作业地带 质量通病 沉降 堆载预压
分 类 号:U653.5[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117