检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:匡金钟 高英桂 KUANG Jin-zhong;GAO Ying-gui(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2022年第10期51-55,共5页Yunnan Water Power
摘 要:新建佛清从高速石牛岭隧道从化端右洞进洞段为浅埋、偏压、富水流沙地层,洞内净宽15.75m,为大跨度隧道,洞口右侧大型冲沟常年流水,跨越广东省雨季进洞,洞身开挖期间遭遇突泥、股状水、围岩垮塌等情况,出现了冒顶、洞口右侧边坡泥石流、山洪等地质灾害,针对性地调整开挖方法和支护方案,采取处置措施成功进洞,安全贯通球状孤石群堆积体软弱带围岩。The entrance section of the right tunnel at ConghuaEnd of Shiniuling Tunnel is shallow buried,bias pressure and flow-rich sediment layer.The net width of the tunnel is 15.75m and it is a large-span tunnel.The large gully on the right side of the opening runs year after year.Due to the rainy season in Guangdong Province,mud burst,stranded water,collapse of surrounding rock and other geological disasters occurred during excavation of the tunnel body.At the same time,such geological disasters as roof fall,debris flow on the right side of the opening and mountain torrents occurred.In this paper,according to the characteristic adjustment excavation method and support scheme,the treatment measures are adopted to successfully enter the tunnel and safely penetrate the surrounding rock of weak zone of globular boulder group accumulation.
分 类 号:U455.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38