检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邱文君 李学波 蔡桂安 QIU Wen-jun;LI Xue-bo;CAI Gui-an(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《云南水力发电》2022年第10期136-139,共4页Yunnan Water Power
摘 要:在市政污水管网施工过程中,往往存在新建超深大型污水管道的新管接驳施工。对于超深大型污水管道接驳而言,其原状管污水排量大,实施临排条件苛刻,无法长时间封堵。因此超深大型污水管道施工如何确保新旧管道安全、快捷的接驳成为当下市政管网工程的难题。依托于惠州金山新城水环境工程,对超深满水带压污水井接驳进行深入研究,采取检查井井碰井的工艺,并引进专业的潜水员作业班组,总结一套深基坑满水带压管网接驳技术。During the construction of municipal sewage pipe network,it is often necessary to construct a new pipe connection for a new super-deep and large sewage pipe.For the connection of super-deep and large-scale sewage pipeline,the original sewage discharge in the pipeline is large and the discharge conditions are harsh,so it can not be blocked for a long time.Therefore,how to ensure the safe and fast connection between the old and the new pipelines in the construction of super-deep and large sewage pipeline becomes a difficult problem in the municipal pipeline network engineering at present.Based onHuizhou Jinshan New City Water Environment Project,this paper makes a deep study on the connection of ultra-deep full water and pressurized sewage well.A set of connection technology of full water and pressurized pipe network in deep foundation pit is summarized by adopting the process of checking well collision and introducing professional diving crew.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7