城市深基坑满水带压管网接驳技术研究  

Research on Connection Technology of Full Water Pressurized Pipe Network of Deep City Foundation Pit

在线阅读下载全文

作  者:邱文君 李学波 蔡桂安 QIU Wen-jun;LI Xue-bo;CAI Gui-an(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)

机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041

出  处:《云南水力发电》2022年第10期136-139,共4页Yunnan Water Power

摘  要:在市政污水管网施工过程中,往往存在新建超深大型污水管道的新管接驳施工。对于超深大型污水管道接驳而言,其原状管污水排量大,实施临排条件苛刻,无法长时间封堵。因此超深大型污水管道施工如何确保新旧管道安全、快捷的接驳成为当下市政管网工程的难题。依托于惠州金山新城水环境工程,对超深满水带压污水井接驳进行深入研究,采取检查井井碰井的工艺,并引进专业的潜水员作业班组,总结一套深基坑满水带压管网接驳技术。During the construction of municipal sewage pipe network,it is often necessary to construct a new pipe connection for a new super-deep and large sewage pipe.For the connection of super-deep and large-scale sewage pipeline,the original sewage discharge in the pipeline is large and the discharge conditions are harsh,so it can not be blocked for a long time.Therefore,how to ensure the safe and fast connection between the old and the new pipelines in the construction of super-deep and large sewage pipeline becomes a difficult problem in the municipal pipeline network engineering at present.Based onHuizhou Jinshan New City Water Environment Project,this paper makes a deep study on the connection of ultra-deep full water and pressurized sewage well.A set of connection technology of full water and pressurized pipe network in deep foundation pit is summarized by adopting the process of checking well collision and introducing professional diving crew.

关 键 词:深基坑 接驳 井碰井 顶管施工 

分 类 号:TU992.24[建筑科学—市政工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象