检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐强国 朱荣 张辉 Xu Qiangguo;Zhu Rong;Zhang Hui(Zhaolou Coal Mine,Yanzhou Coal Heze Energy and Chemical Co.,Ltd.,Shandong Heze 274705)
机构地区:[1]兖煤菏泽能化有限公司赵楼煤矿,山东菏泽274705
出 处:《山东煤炭科技》2022年第10期155-157,共3页Shandong Coal Science and Technology
摘 要:根据实测数据工作面地表移动延续时间、起动距、最大下沉速度滞后角等动态参数,研究赵楼煤矿巨厚表土层开采地表移动变形规律。研究表明,赵楼煤矿工作面最大下沉速度随着采厚和采宽采深比的增加而增大,最大下沉速度滞后角随着工作面推进速度和采深的增加而增大,拐点偏移距随着表土层厚度的增大而减小。According to the dynamic parameters such as the duration of surface movement,starting distance and lag angle of maximum subsidence velocity in the measured data,the law of surface movement and deformation in super-thick topsoil mining in Zhaolou Coal Mine is studied.The study shows that the maximum subsidence velocity of the working face in Zhaolou Coal Mine increases with the increase of the mining thickness and mining width-depth ratio of the working face,and the lag angle of the maximum subsidence velocity increases with the increase of the advancing speed and mining depth of the working face.The inflection point offset decreases with the increase of the thickness of the topsoil layer.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.177