检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈飞 羊艳 史文龙 王树谦[2] CHEN Fei;YANG Yan;SHI Wenlong;WANG Shuqian(General Institute of Water Resources and Hydropower Planning and Design,Beijing 100120,China;Hebei University of Engineering,Handan 056009,China)
机构地区:[1]水利部水利水电规划设计总院,北京100120 [2]河北工程大学,邯郸056009
出 处:《南水北调与水利科技(中英文)》2022年第5期1019-1026,共8页South-to-North Water Transfers and Water Science & Technology
基 金:国家重点研发计划项目(2018YFC0406505)。
摘 要:我国在河北开展地下水超采综合治理试点,为了掌握各项措施的实际压采效果与技术经济性,采用现场抽水灌溉试验、入户走访调查等手段,通过治理区地块与非治理区地块治理前后地下水灌溉用水量的对比,分析总结各项措施的压采效果与实施经验,并通过治理措施的投入成本与压采效果对比,研究剖析各项治理措施的技术经济性。研究结果表明:治理措施较好地发挥了减少地下水开采的作用,种植结构调整措施和水源置换措施减少地下水开采量超过2400 m^(3)/hm^(2);高效节水灌溉措施、水源置换措施实施初期所需建设投资较大,导致单位压采量所需投资较高,农业种植结构调整类措施实施初期的投资相对较低,但后期单位压采量所需投资逐年增加。从压采效果、技术经济性、水源条件与超采类型及程度4个方面,对不同地区选择治理措施给出建议,为今后地下水超采治理提供参考。A comprehensive groundwater overdraft control pilot project was launched in Hebei Province,China due to severe groundwater overexploitation problems,and many control measures were implemented including highly efficient irrigation,water source replacement,planting structure adjustment,etc.The performance,implementation difficulty,and investment of different measures vary drastically.To further upscale and promote the pilot project,the comprehensive evaluation of each measure became increasingly important.Many existing studies focus on the evaluation of the overall effect of the project,such as reduced pumping rate,water level change,storage change,etc.,but failed to answer the question of the performance and economic efficiency of specific measures.Different research methods had been used synergistically including irrigation on-site tests,household visits,surveys,technical and economic analysis.Comparative experiments on the same crop with different irrigation methods were conducted yearly throughout the whole duration of the project within the pilot and non-pilot areas in Shijiazhuang,Cangzhou,Hengshui,Xingtai and Handan.The water-saving capacity was attained by analyzing the water consumption of traditional irrigation methods,and water-saving irrigation methods.The performance of different control measures for the whole pilot area was calculated based on the groundwater abstraction rate change analysis before and after the comprehensive governance.The input-output ratio of different groundwater overdraft control measures was estimated by calculating the investment per unit of reduced groundwater extraction.The investment equaled the initial investment and the additional cost for the following years.The reduced groundwater extraction could be deduced using the groundwater abstraction rate change from the performance evaluation.The results show that adopted measures played an essential role in alleviating groundwater overdrafts.Taking the wheat-maize planting pattern as an example,the annual saved water per hectar
关 键 词:地下水超采治理 现场抽水灌溉试验 节水量 投入成本
分 类 号:TV21[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.136.18.247