检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张成 何林巍 孙路 高宇辉 田强 ZHANG Cheng;HE Linwei;SUN Lu;GAO Yuhui;TIAN Qian(State Grid Qingpu Power Supply Company,SMEPC,Shanghai 201707,China)
机构地区:[1]国网上海市电力公司青浦供电公司,上海201707
出 处:《电力与能源》2022年第4期315-318,共4页Power & Energy
摘 要:随着城市基础建设进程的加快和线路走廊环境的变化,35 kV架空线路树线矛盾日益突出,大型机械施工区域外破风险剧增,在线路不停电的情况下对35 kV电力裸导线实施带电绝缘涂覆,可以高效而安全地消除线路风险隐患,最大程度地减少施工作业对用户的停电影响,不断提升城市供电的可靠性。对35 kV架空线路带电绝缘涂覆工艺流程和施工技术进行了探讨。With the acceleration of the urban infrastructure construction and the changes of the line corridor environment, the contradiction between the 35 kV overhead line and the surrounding trees has become increasingly prominent, and the risk of breaking outside the construction area of large machinery has increased sharply. Under the condition of live operation, the live insulation coating of 35 kV bare electric wire can effectively and safely eliminate the risks and hidden dangers of the line, minimize the power outage impact of construction operations on users, and continuously improve the reliability of urban power supply. The process flow and construction technology of 35 kV overhead line live insulation coating are discussed.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.37.17