检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡卫娟 胡建永 李柏庆 HU Weijuan;HU Jianyong;LI Baiqing(Power China Zhongnan Engineering Co.,Lld.,Changsha 410014,China;School of Geomatics and Municipal Engineering,Zhejiang University of Water.Resources and Electric Poruer,Hangzhou 310018,China;Key Laboratory for Technology in Rural Water Management of Zhejiang Province,Hangzhou 310018,China;Engineering Research Center of Digital Twin Basin of Zhejiang Province,Hangzhou,310018,China;Hebei Research Institute of Investigation&Design of WaterConservuncy&Hydroporwer GroupCo.,Ltd.,Tianjin 300221,China)
机构地区:[1]中国电建集团中南勘测设计研究院有限公司,长沙410014 [2]浙江水利水电学院测绘与市政工程学院,杭州310018 [3]浙江省农村水利水电资源配置与调控关键技术重点实验室,杭州310018 [4]数字孪生流域技术与装备浙江省工程研究中心,杭州310018 [5]河北省水利水电勘测设计研究院集团有限公司,天津300221
出 处:《给水排水》2022年第9期107-111,共5页Water & Wastewater Engineering
基 金:国家自然科学基金(51379064);浙江省自然科学基金(ZJWZ22E092231)。
摘 要:针对长距离供水工程设计中遇到的水锤防护难题,设计了联合防护措施的解决方案。以瞬变流基本理论为依据搭建了多个防护方案的水力分析模型,进行实例计算,并对比了联合防护方案与单一防护方案的优劣。结果表明,水锤联合防护措施与单一防护措施相比,在保证系统安全运行的同时,能明显减少工程投资,方便后期运行维护,具有更好的可行性和经济性。In the view of the water hammer protection problems in the design of long-distance water supply project, a solution of water hammer joint protection measures was designed. Based on the theory of transient flow, a variety of hydraulic analysis modes are established. Example calculation was carried out, and the advantages and disadvantages of the joint protection and the single protection were compared. The results show that, compared with a single protection measure, water hammer joint protection can significantly reduce project investment while ensuring the safe operation of the system, facilitate subsequent operation and maintenance, and have better feasibility and economy.
分 类 号:TV134.1[水利工程—水力学及河流动力学] TV672.2
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.145.54