作 者:胡远婷 崔佳鹏 穆兴华 董尔佳 HU Yuanting;CUI Jiapeng;MU Xinghua;DONG Erjia(Elecric Power Research Institute of State Grid Heilongjiang Electric Power Co.,Ltd.,Harbin 150030,China)
机构地区:[1]国网黑龙江省电力有限公司电力科学研究院,哈尔滨150030
出 处:《黑龙江电力》2022年第4期321-325,共5页Heilongjiang Electric Power
摘 要:该文将镜泊湖水电厂作为黑启动电源,采用电力系统综合稳定程序(PSASP)和全数字实时仿真软件(ADPSS)对黑启动过程进行仿真;随后进行现场零起升压黑启动试验,在发电机出口处和励磁处进行全过程录波,将仿真结果与现场测试结果进行对比,验证仿真分析的准确性和有效性。通过对试验数据进行分析,总结镜泊湖水电厂在黑启动各个阶段具备黑启动条件,证明镜泊湖水电厂具有快速黑启动能力。This paper takes Jingpo lake hydropower plant as the black start power supply,simulates the black start process by using power system comprehensive stability program(PSASP)and all digital real-time simulation software(ADPSS).then carries out the field black start test of raising voltage from zero,and records the whole process at the generator outlet and excitation.The simulation results are compared with the field test results to determine the accuracy and effectiveness of the simulation analysis.Through the analysis of the test data,it is concluded that Jingpo lake hydropower plant has the black start conditions in each stage of black start,which proves that Jingpo lake hydropower plant has the ability of fast black start.
分 类 号:TM662[电气工程—电力系统及自动化] TM744
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171