检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐波 XU Bo(China Power Construction Hainan Construction Investment Co.,Ltd.,Haikou 570100 China)
机构地区:[1]中电建海南建设投资有限公司,海南海口570100
出 处:《科技创新与生产力》2022年第10期44-46,49,共4页Sci-tech Innovation and Productivity
摘 要:本文对绿色矿山概念进行阐释,并对绿色矿山项目的建设对象进行细致分类,从时间、资金、生态等多个角度对绿色矿山建设的必要性进行分析。以大唐观音岩水电站巨型人工砂石系统项目为例,研究该项目在时间管控、资金管控和社会生态效益管控等方面采取的相应措施。This paper expounds the concept of green mine,classifies the construction objects of green mine projects in detail,and analyzes the necessity of green mine construction from time,capital,ecology and other perspectives.Take the giant artificial sand and gravel system project of Datang Guanyinyan Hydropower Station as an example to study the corresponding measures taken in the project in terms of time control,capital control and social ecological benefit control.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222