检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:LI Miao SUN Lijie WANG Bin ZHENG Zhen QI Yemin
机构地区:[1]Aerospace System Engineering Shanghai,Shanghai 201109
出 处:《Aerospace China》2022年第2期69-75,共7页中国航天(英文版)
摘 要:According to the unattended loading requirements of the new generation launch vehicles,auto-docking technology for the first stage fill-drain connector and zero-second quick detachment technology for the second stage fill-drain connector were proposed based on the analysis and summary of unattended loading connector technology at home and abroad.These technical solutions were verified to be reasonable and feasible by tests,and they had been successfully applied to the Long March 6 A(LM-6 A),laying a foundation for the unattended test and launch of the new generation launch vehicles.
关 键 词:launch vehicle UNATTENDED automatic docking zero-second detachment
分 类 号:V554.4[航空宇航科学与技术—人机与环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38