火电厂500kV断路器测控装置升级改造  

Upgrading of 500 kV Circuit Breaker Measurement and Control Devices for a Coal-fired Power Plant

在线阅读下载全文

作  者:卞兴炜 张玉杰 BIAN Xingwei;ZHANG Yujie(Tianji Power Plant of Huaihu Coal and Power Co.,Ltd.,Huainan 232098)

机构地区:[1]淮沪煤电有限公司田集发电厂,安徽淮南232098

出  处:《电力安全技术》2022年第9期43-45,共3页Electric Safety Technology

摘  要:介绍了某火电厂500 kV第1串三台断路器测控装置、机组测控屏柜改造升级的实施过程,通过采取“掏屏改造”方式更新改造老旧设备,节约了工期,严控了风险,可供类似的改造项目借鉴。The implementation of upgrading the measurement and control devices for the first series of three 500 kV circuit breakers and the unit measurement and control panel cabinet in a coal-fired power plant is introduced.By adopting the "screen removal transformation",the old equipment is updated and renovated,which saves the construction period,strictly controls the risks and can be used as the reference for similar renovation projects.

关 键 词:500 kV升压站 测控装置 升级改造 

分 类 号:TM631.1[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象