检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马千里 卢扬 王语萌 MA Qianli;LU Yang;WANG Yumeng(Beikongzhongkecheng Environmental Protection Group Co.,Ltd.,Chengdu 610031,China)
机构地区:[1]北控中科成环保集团有限公司成都分公司,成都610031
出 处:《工业用水与废水》2022年第5期67-70,共4页Industrial Water & Wastewater
摘 要:涂料生产废水具有成分复杂、水质波动大、 COD和SS浓度高、可生化性差等特点,废水处理难度大。某涂料企业综合废水处理工程采用了分流预处理的设计思路,建筑涂料废水采用污泥调理-板框压滤-调节-混凝气浮的预处理工艺,树脂、固化剂废水采用隔油沉淀-pH调节-铁碳微电解-混凝气浮物化预处理工艺,综合废水采用ABR厌氧-两级生物接触氧化的处理工艺,出水指标满足GB 8978—1996《污水综合排放标准》三级标准。Wastewater from coating production has characteristics of complex composition, large water quality fluctuation, high COD and SS concentration and poor biodegradability, which is difficult to treat. The comprehensive wastewater treatment project of a coating enterprise adopts the design idea of diversion pretreatment;the architectural coating production wastewater is treated by combined pretreatment of sludge conditioning-plate frame pressure filtration-adjustion-coagulation air flotation;the resin and curing agent production wastewater is pretreated by physicochemical process of oil insulative deposition-pH regulation-iron carbon microelectrolysiscoagulation air flotation;the comprehensive wastewater is treated by treatment process of ABR anaerobic-two stage biological contact oxidation. The effluent water index meets the requirement of grade 3 in GB 8978—1996 Integrated wastewater discharge standard.
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.68