检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张赛[1] 姜旭辉 方晓红 张乾坤 ZHANG Sai;JIANG Xuhui;FANG Xiaohong;ZHANG Qiankun(School of Civil Engineering,Anqing Vocational and Technical College,Anqing,246003,China;Hefei Municipal Design and Research Institute Co.,Ltd,Hefei,230000,China)
机构地区:[1]安庆职业技术学院建筑工程学院,安徽安庆246003 [2]合肥市市政设计研究总院有限公司,安徽合肥230000
出 处:《华北科技学院学报》2022年第5期102-111,共10页Journal of North China Institute of Science and Technology
基 金:安徽省高校优秀青年骨干教师国外访问研修项目(gxgwfx2020067);国家级职业教育教师教学创新团队建设项目(YB2020070202);安庆职业技术学院大学生科技创新项目(XJKC202119)。
摘 要:安徽省合肥地区地处郯庐地震带末端,与华北平原、长江下游-黄海两个地震带接壤,为分析多个地震带交接区域地震安全性,以合肥包公大道店埠河特大桥工程场地为研究对象,从该工程场地的地形地貌、近场地震活动特性入手,研究确定场地的地震动特征参数与衰减关系,通过计算分析地震动加速度峰值和反应谱特征,并在此基础上就确定地震动持时参数,采取人工合成的方法拟合地震动时程曲线。研究表明:该场地地震极限值M uz为8.5,参与计算最低震级M 0为4.0级;场地所在郯庐地震带b值为0.85和ν4为4.0;在不同超越概率下场地基岩水平峰值加速度分别为22gal、78gal、151gal和34gal、107gal、188gal。研究结果能为该区域相似桥梁工程以及相关工程抗震设计提供参考。Hefei area of Anhui province is located at the end of the Tanlu seismic zone,bordering on the North China Plain and the lower reaches of the Yangtze river Yellow sea.In order to analyze the seismic safety of the junction area of multiple seismic zones,this paper taks the Dianbu river bridge project site of Baogong Avenue in Hefei as the research object,starting from the landform and Near-Field Seismic activity characteristics of the project site,the seismic characteristic parameters and attenuation relationship of the site are studied and determined.Based on the calculation and analysis of the characteristics of ground motion acceleration peak and response spectrum,the seismic duration parameters are determined,and the artificial synthesis method is adopted to fit the ground motion time history curve.The research shows that the seismic limit value of the site is M UZ=8.5,and the lowest magnitude involved in the calculation is M 0=4.0;Tanlu seismic zone where the site is located b=0.85 andν4=4.0;Under different exceedance probabilities,the horizontal peak acceleration of bedrock in the field is 22gal,78gal,151gal and 34gal,107gal and 188gal respectively.The research results can provide reference for the seismic design of similar bridge projects and related projects in this area.
分 类 号:U442.5[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3