大型海洋平台荔湾3-1 CEP组块建造中的尺寸控制  

Dimension Control on Fabrication of Super-Large Topside LW3-1 CEP

在线阅读下载全文

作  者:鹿胜楠[1] 刘超[1] Lu Shengnan;Liu Chao(Offshore Oil Engineering(Qingdao)Co.,Ltd.,Qingdao 266520,China)

机构地区:[1]海洋石油工程(青岛)有限公司,山东青岛266520

出  处:《山东化工》2022年第19期196-199,共4页Shandong Chemical Industry

摘  要:作为国内最大的海洋平台,荔湾3-1 CEP组块涉及较多厚壁结构的焊接,如何控制厚板焊接产生的变形是一个重要环节。此外,由于荔湾3-1 CEP组块特殊的建造工艺,建造过程中的重量转移对地基沉降及尺寸控制也有较高要求。从以上两点出发,分析研究了焊接变形的预防措施,并设计出特定工装,满足组块下放过程对尺寸的严格要求。As the biggest offshore platform in China,a lot of thick plates’welding are involved in fabrication of LW3-1 CEP topside,it’s an important part to control the deformation of the thick plates during welding.Besides,LW3-1 CEP topside is constructed with a special process,foundation settlement dimension should be also strictly controlled during the fabrication.Deformation precautions are researched in this article on the basis of above-mentioned aspects,a special tooling is designed to satisfy the dimension demand during load transference.

关 键 词:海洋钢结构 焊接变形 尺寸控制 重量转移 

分 类 号:TE54[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象