检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:程志平 郑建新 CHENG Zhi-ping;ZHENG Jian-xin(Dexing Copper Mine,Jiangxi Copper Company Limited,Dexing 334224,Jiangxi China)
机构地区:[1]江西铜业股份有限公司德兴铜矿,江西德兴334224
出 处:《铜业工程》2022年第5期18-20,49,共4页Copper Engineering
摘 要:为解决德兴铜矿采区运输道路雨季严重翻浆、旱季尘土飞扬的难题,通过一年多的考察调研,充分了解了浆土路的应用案例和推广动态,并全方位地了解其施工、运行和维护的整体过程,以及带来的成效。同时,对比分析浆土路应用过程中的道路参数、运输设备运行参数和黏土属性,类比分析云南集团鹤庆北衙矿业有限公司(简称“北衙金矿”)浆土路试验道路和锡林浩特国家能源胜利露天煤矿(简称“胜利露天煤矿”)FRT生物酶道路的运行效益。结果表明,德兴铜矿采用浆土路修筑技术是可行的,能大幅度降低采区道路运行和维护成本。In order to solve the problem of serious mud turning in the rainy season and dust flying in the dry season of Dexing Copper Mine transportation road,through more than one year of investigation and research,fully understand the application cases and promotion trends of mud road,and fully understand the overall process of its construction,operation and maintenance,as well as the production benefits.At the same time,the road parameters,transport equipment operation parameters and clay properties in the application process of slurry soil road were compared and analyzed,and the benefits of Beiya Gold Mine slurry soil test road and FRT bioenzyme road in Shengli open pit coal mine were analyzed by analogy.The results show that it is feasible to use mud road construction technology in Dexing Copper Mine,which can greatly reduce the cost of road operation and maintenance.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.178.51