检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:桂晓凯 梁柱俊 GUI Xiao-kai;LIANG Zhu-jun(Guixi Smelter,Jiangxi Copper Corporation Limited,Guixi 335424,Jiangxi,China)
机构地区:[1]江西铜业股份有限公司贵溪冶炼厂,江西贵溪335424
出 处:《铜业工程》2022年第5期67-69,共3页Copper Engineering
摘 要:针对分金渣中由于金含量过高而存在贵金属流失的现象,对分金压榨工序参数进行优化研究。试验以正常生产的分金渣为原料,通过改变浆化时间、浆化固液比、漂洗时间,研究三者对分金渣中金含量的影响。试验结果表明,在分金渣浆化时间为15min、浆化固液比为1∶3、漂洗时间为15min条件下,可达到最佳效果,分金渣中金含量仅有0.047%,满足实际生产需要。Aiming at the phenomenon of precious metal loss due to the high gold content in gold separation slag,the process parameters of gold separation pressing are optimized and studied.The influence of slurry time,slurry solid-liquid ratio and rinsing time on the gold content in gold separation slag is studied by using normal production gold separation slag as raw material.The experiment results show that the best effect can be achieved under the conditions of slurry time of 15min,and slurry solid liquid ratio of 1∶3,and rinsing time of 15min.The gold content in gold separation slag is only 0.047%,which meets the actual production needs.
分 类 号:TF831[冶金工程—有色金属冶金]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171