检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张海宝 陈燕杰 伏晓丹 孟祥龙 张鹏 李小凡 ZHANG Hai-bao;CHEN Yan-jie;FU Xiao-dan;MENG Xiang-long;ZHANG Peng;LI Xiao-fan(China Nerin Engineering Co.,Ltd.,Nanchang 330038,Jiangxi,China)
机构地区:[1]中国瑞林工程技术股份有限公司,江西南昌330038
出 处:《铜业工程》2022年第5期70-73,共4页Copper Engineering
摘 要:为了提高氧化铜钴矿湿法冶金过程中的铜钴回收率,对浸出、浸出渣洗涤、萃取、除铁锰等工艺过程进行了综合分析,并针对制约铜钴回收率的主要因素,提出了相应的解决方法。实践表明,选择合适的浸出方式、浸出渣洗涤方式,增加低铜萃取段,采用低浓度二氧化硫除铁锰工艺,能显著提高铜钴回收率。In order to improve copper-cobalt recovery rate from copper-cobaltoxide during the hydrometallurgical process,the technological process of acid leaching,CCD,copper SX and FAM removal process are analyzed.Solutions of improving copper-cobalt recovery rate are pointed out according to the main factors which restricting the recovery rate of copper and cobalt.Practice shows the recovery rate of copper and cobalt can be significantly improved by selecting suitable leaching methods,washing methods,setting extra low-grade copper SX process and taking low concentration SO2 gas as FAM removal reagent.
关 键 词:氧化铜矿 氧化钴矿 浸出渣洗涤 低铜萃取 除铁锰
分 类 号:TF811[冶金工程—有色金属冶金] TF816
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.141.28.197