检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘俊佳 LIU Junjia
机构地区:[1]同济大学建筑设计研究院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2022年第10期255-258,M0023,共5页Urban Roads Bridges & Flood Control
摘 要:某山体暗挖隧道具有浅埋、偏压、大跨度、双连拱的难点。为了探究该隧道施工过程中初支结构的内力及山体边坡的稳定性变化,采用plaxis 2d岩土有限元软件对施工过程主要的15道开挖支护工序进行数值模拟。通过地层荷载法揭示各个施工步骤中衬砌结构的内力变形规律,同时基于强度折减法求出安全系数对山体边坡稳定性进行评价。根据此数值模拟结果,对该隧道结构设计提出指导性的意见。A mountain bored tunnel has the difficulties of shallow burial, eccentric pressure, long span and double-continuous arch. In order to explore the internal force of the initial support structure and the stability change of the mountain slope during the tunnel construction, the PLAXIS 2D geotechnical finite element software is used to numerically simulate the 15 main excavation and support processes during the construction process. The internal force and deformation laws of the lining structure in each construction step are revealed by the stratum load method, and at the same time, based on the strength reduction method, the safety factor is obtained to evaluate the stability of mountain slope. According to the numerical simulation results, some guiding opinions on the structural design of the tunnel are put forward.
分 类 号:U452.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33