超高独立柱操作架搭设施工技术  

Construction technology of super-high independent column operation frame erection

在线阅读下载全文

作  者:王伟[1] 郑文涛[1] 龚章权 张颖 

机构地区:[1]中国建筑第二工程局有限公司,湖南长沙410000

出  处:《建筑机械》2022年第11期32-35,共4页Construction Machinery

摘  要:为满足一些大跨度、大空间建筑物的实现,在对其上部结构进行支撑时,往往会选择若干独立柱作为其结构支撑基础。因其结构的高度较高,每块结构的支撑会设置单独的超高独立支撑柱。在进行超高独立柱施工时,因其与周边结构未有连接,需单独搭设脚手架进行施工。本文针对每个独立柱的高度及特点,通过与柱子本身的拉结来实现施工过程中人员的操作。该超高独立柱操作架的搭设较好地解决了施工过程中的困难。In order to meet the realization of some large-span and large-space buildings, some independent columns are often selected as the structural support foundation when supporting the superstructure. Due to the high height of the structure, the support of each structure will be equipped with separate super-high independent support columns. In the construction of the ultra-high independent column, because it is not connected with the surrounding structure, separate scaffolding shall be set up for construction. In this paper, according to the height and characteristics of each independent column, the operation of personnel in the construction process can be realized by pulling with the column itself. The construction of the super high independent column operating frame solves the difficulties in the construction process.

关 键 词:超高独立柱 井字架 大跨度 脚手架 拉结 

分 类 号:TU242.9[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象