检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:颜晓光[1] Yan Xiaoguang(Beijing Shougang International Engineering Technology Co.,Ltd,Beijing,100041)
机构地区:[1]北京首钢国际工程技术有限公司,北京100041
出 处:《制冷与空调(四川)》2022年第5期693-700,共8页Refrigeration and Air Conditioning
摘 要:以数据中心采用的冷却塔间接供冷系统为研究对象,分析了不同工况、不同空调冷水温度时冷却塔、制冷机组及板式换热器的性能变化趋势。并以某数据中心的空调系统为例,建立了分析模型,计算分析了不同冷水温度时,冷源综合制冷性能系数(SCOP)及全年运行能耗情况。结果表明,通过提高空调冷水温度、增加冷却塔的冷却能力,可减少制冷机组的全年运行时间,显著降低全年运行能耗。This paper takes the cooling tower indirect cooling system used in the data center as the research object,and analyzes the performance trend of cooling towers,refrigeration units and plate heat exchangers under different working conditions and different air-conditioning cold water temperatures.Taking the air conditioning system of a data center as an example,an analysis model was established to calculate and analyze the comprehensive coefficient of performance(SCOP)of the cold source and the annual operating energy consumption at different cold water temperatures.The results show that by increasing the temperature of the air-conditioning cold water and increasing the cooling capacity of the cooling tower,the annual operating time of the refrigeration unit can be reduced,and the annual operating energy consumption can be significantly reduced.
关 键 词:数据中心 制冷机组 冷却塔 板式换热器 SCOP
分 类 号:TU834[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30