检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:罗永川 LUO Yongchuan(Sinohydro Jiajiang Hydraulic Machinery Co.,Ltd.,Leshan 614100)
机构地区:[1]中国水利水电夹江水工机械有限公司,乐山614100
出 处:《现代制造技术与装备》2022年第9期107-109,共3页Modern Manufacturing Technology and Equipment
摘 要:水电站双向门机门架结构尺寸大、自重大以及制造工艺复杂,需要在门架制造过程中采用科学、合理的拼焊工艺和组装方法,确保双向门机门架制造质量达到设计要求。结合实际工作经验,介绍水电站双向门机门架制造的主要工艺技术措施,可为双向门机门架制造提供参考。The two-way gantry crane structure of hydropower station has large external dimensions, self weight and complex manufacturing technology. It is necessary to adopt scientific and reasonable welding process and assembly method in the gantry manufacturing process to ensure that the manufacturing quality of the two-way gantry crane can meet the design requirements.Combined with practical work experience, this paper introduces the main technological measures for the manufacture of two-way gantry crane gantry of hydropower station, which provides valuable reference for the manufacture of two-way gantry crane gantry.
分 类 号:TV74[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248