检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁兴宇 梁俊宇 王达达 舒杰[2] 刘梦华 王浩[2] 吴昌宏[2] YUAN Xingyu;LIANG Junyu;WANG Dada;SHU Jie;LIU Menghua;WANG Hao;WU Changhong(Electric Power Research Institute,Yunnan Power Grid Co.,Ltd.,Kunming 650214,China;Key Laboratory of Renewable Energy,Guangzhou Institute of Energy Conversion,Chinese Academy of Sciences,Guangzhou 510640,China)
机构地区:[1]云南电网有限责任公司电力科学研究院,昆明650214 [2]中国科学院广州能源研究所可再生能源重点实验室,广州510640
出 处:《电力需求侧管理》2022年第6期6-13,共8页Power Demand Side Management
基 金:中国南方电网有限责任公司科技项目(ZBKJXM20190051)。
摘 要:从实用角度出发,提出一种简洁、利于广大用户和地方政府接受的电能替代成本评估和补贴计算方案,并据此得出关于电能替代的实施建议。首先指出促进电能替代的关键是用户有实施意愿,从而要求电能替代对用户而言是经济的。然后,从避免用户投资损失的角度,将老设备剩余寿命的价值计入新设备的使用成本,并基于此,将国家公布的20项电能替代技术根据其特点分为5类,对每类技术分别构建成本评估和补贴计算方案。最后,根据所得结论提出相关实施建议,并举例展示该方案的应用。对电能替代而言,该方案可提高用户实施的积极性,而所提实施建议能高效发挥财政补贴的促进作用,具有一定的参考价值和实践意义。From a practical point of view, a cost and subsidy evaluation scheme is proposed for electric energy substitution,which is both concise and acceptable for users and local governments. Based on this scheme, some suggestions for the implementation in electric energy substitution are proposed. Firstly, it is pointed out that the key to promoting electric energy substitution is the willingness of the mass users to practice, which requires a lower use cost after the electric energy substitution. And then in order for users to avoid investment loss, the loss expense of the remain life of old equipment is included in the use cost of new equipment, and there upon the 20 electric energy substitution technologies officially announced are divided into 5 categories according to their characteristics, and the cost and subsidy evaluation scheme of each category is designed respectively. Finally, according to the achieved conclusions, some related suggestions for the implementation of electric energy substitution are proposed, and some examples are taken to demonstrate the scheme afterwards. For electric energy substitution, the scheme can promote the application while the suggestions can ensure a high efficiency of the subsidy, whereby the conclusions have certain reference value and practical significance.
关 键 词:电能替代 成本评估 补贴计算 用户意愿 设备改造
分 类 号:TM73[电气工程—电力系统及自动化] TK018[动力工程及工程热物理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.2.112