检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李昂[1] 刘加强[1] 汪思颖 LI Ang;LIU Jiaqiang;WANG Siying(School of Environmental Engineering,Xuzhou Institute of Technology,Xuzhou221111,China)
机构地区:[1]徐州工程学院环境工程学院,江苏徐州221111
出 处:《净水技术》2022年第11期121-126,共6页Water Purification Technology
基 金:徐州市重点研发计划(KC19218)。
摘 要:城市排水管网是城市重要的基础设施和组成部分,是维持现代化城市正常运作的命脉。近年来,为了解决城市内涝的问题,各地加快了老旧管网改造的步伐。在前期基础资料收集和实际调研基础上,构建了徐州市某汇水区的排水SWMM模型,模拟分析了在不同重现期下(1、2、3、5 a)汇水区现状排水管网承载能力和内涝程度。结果表明,汇水区雨水管网排水能力有约48%满足1年一遇重现期,满足1~2年一遇重现期的占47%,满足2~3年一遇重现期的占2%,满足3~5年一遇重现期的占3%,满足大于5年一遇重现期的约占0。随着降雨重现期的增大,汇水区积水面积和积水深度也随着增加。其中,1年一遇重现期下,淹没区面积占4.12%,淹没深度大于0.2 m占0.71%;2年一遇重现期下,淹没区面积占5.51%,淹没深度大于0.2 m占0.94%;3年一遇重现期下,淹没区面积占7.02%,淹没深度大于0.2 m占1.08%;5年一遇重现期下,淹没区面积占8.45%,淹没深度大于0.2 m占1.28%。研究结果可为后期完善现状雨水管网和管网改造提供依据。As a part of the city,urban drainage pipelines network is one of the important infrastructure,maintaining the normal operation of modern towns lifeline.In recent years,the pace of the old drainage network reconstruction has been accelarated to solve the problem of urban waterlogging.Based on the previous basic data collection and practical investigation,the SWMM drainage model of a runoff area in Xuzhou City was constructed to simulate and analyze the carrying capacity and waterlogging degree of current drainage network under different recurrence periods(1,2,3,5 a).The results showed that about 48%of the drainage capacity of the rainwater pipe network in the catchment area could meet the displacement requirement of one-year recurrence period.There was 47%of the drainage capacity of the rainwater pipe network meeting the displacement requirement of 1~2 year recurrence period,2%meeting the 2~3 year recurrence period,3%meeting the 3~5 year recurrence period,and about zero meeting over the five-year recurrence period.With the increase of rainfall recurrence period,the area and depth of water accumulation in catchment area were also increased.In the recurrence period of one-year,two-year,three-year,and five-year,the percentage of flooded area was 4.12%,5.51%,7.02%,and 8.45%,and the submerged depth greater than 0.2 m was 0.71%,0.94%,1.08%,and 1.28%,respectively.The research results can provide a basis for the later improvement for the present rainwater pipe network and the renovation of drainage network.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222