预应力高强钢丝绳加固桥梁效果分析  

Analysis of Static Mechanical Properties of Bridges Strengthened with Prestressed High-Strength Steel Wire Rope

在线阅读下载全文

作  者:康瑾 陈顺超 董春彦 郑维龙 KANG Jin;CHEN Shunchao;DONG Chunyan;ZHENG Weilong(College of Civil Engineering,Southwest Forestry University,Kunming 650224,China)

机构地区:[1]西南林业大学土木工程学院,云南昆明650224

出  处:《河南科技》2022年第20期54-57,共4页Henan Science and Technology

摘  要:预应力高强钢丝绳加固技术是近几年应用在桥梁加固上的新技术,此方法采用小直径的预应力高强钢丝绳结合锚固系统对已经出现裂缝的桥梁实体进行加固,对原结构施加主动应力,以达到加固的目的。本研究选取某二级公路桥在其加固前后分别进行静载试验。结果表明:预应力高强钢丝绳加固后各工况下平均挠度最大降低幅度为-49.94%,最大挠度最大降低幅度为-51.01%,残余挠度均呈现一定幅度的降低,证明加固后梁的强度和刚度均得到较明显的改善,抗弯承载能力明显提高。Prestressed high strength steel wire rope reinforcement technology is a new technology applied to bridge reinforcement in recent years. This method uses small diameter prestressed high strengthening steel wire rope combined with anchorage system to reinforce the cracked bridge entity, and applies active stress to the original structure to achieve the purpose of reinforcement. In this study, a secondary highway bridge is selected to carry out static load test before and after reinforcement. The results show that the maximum reduction range of average deflection is-49.94%, the maximum reduction range of maximum deflection is-51.01%, and the residual deflection is reduced to a certain extent, which proves that the strength and stiffness of the strengthened beam are significantly improved, and the bending capacity is significantly improved.

关 键 词:预应力高强钢丝绳加固 挠度 静载试验 

分 类 号:U446.1[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象