检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王华 Wang Hua(Ganhe Colliery,Shanxi Coke Coal Huozhou Coal Power Group Co.,Ltd.,Hongtong,Shanxi 041600)
机构地区:[1]山西焦煤霍州煤电集团干河煤矿,山西洪同041600
出 处:《江西煤炭科技》2022年第4期80-82,86,共4页Jiangxi Coal Science & Technology
摘 要:干河煤矿2-107工作面为孤岛工作面。为提高煤炭资源回收率,2-1072巷沿2-105采空区边缘掘进,存在相向采掘现象,需要考虑采动应力、侧向支承应力对巷道支护的影响。为降低巷道返修量,有效控制围岩变形,对区段煤柱留设进行理论分析、数值模拟,提出传统长短锚索与注浆锚索联合补强支护方案,确定合理煤柱尺寸与围岩控制方式。通过支护组合技术应用、矿山压力观测数据分析,探讨复杂条件下巷道快速支护围岩控制技术,为复杂条件下围岩控制提供参考。2-107 working face in Ganhe Colliery is an isolated island working face.In order to reduce the repair amount of the roadway and effectively control the deformation of the surrounding rock,the author carried out theoretical analysis and numerical simulation of the coal pillar setting in the section,proposes the combined reinforcement and support scheme of traditional long and short anchor cables and grouting anchor cables,and determines the reasonable coal pillar size and the surrounding rock control method,which provides reference for surrounding rock control under complex conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.184.109