检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张超 何少润 林恺 叶飞 ZHANG Chao;HE Shao-run;LIN Kai;YE Fei(Construction and Management Branch of CSC Power Generation Co.,Ltd.,Guangzhou,510000,China)
机构地区:[1]南方电网调峰调频发电有限公司工程建设管理分公司,广东广州510000
出 处:《水电站机电技术》2022年第11期1-4,179,共5页Mechanical & Electrical Technique of Hydropower Station
摘 要:介绍了梅州抽水蓄能电站在转轮设计、制造过程中采用的分叶盘新工艺制造方案、工艺流程及质量控制相关措施,确保了转轮制造进度及质量的可控,为电站首台机投产奠定了基础,供后续项目参考。This paper introduces the new process manufacturing scheme,process flow and quality control measures of the blade splitter disc used in the runner design and manufacturing process of Meizhou Pumped Storage Power Station,which ensures the control of the manufacturing schedule and quality of the runner,lays a foundation for the first unit of the power station to be put into operation,and provides reference for subsequent projects.
分 类 号:TV734.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33