检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭凯 GUO Kai(Anfu County Water Conservancy Bureau of Jiangxi Province,Anfu County,Jiangxi Province,343200)
机构地区:[1]江西省吉安市安福县水利局,江西安福343200
出 处:《江西水利科技》2022年第6期462-465,共4页Jiangxi Hydraulic Science & Technology
摘 要:随着我国水利工程标准化进程的加快,水利标准的数量和质量不断提升,参与标准编制的人员队伍不断扩大。编制人员对编制程序及各阶段工作注意事项的了解不深入,将引发编写质量差、标准进度滞后等问题。本文围绕水利标准编制管理办法修订、编制程序及注意事项开展了探讨,可为相关人员提供参考。With the acceleration of the standardization process of water conservancy projects in China,the quantity and quality of water conservancy standards have been continuously improved,and the team of personnel participating in the preparation of standards has continued to expand.The lack of in-depth understanding of the compilation procedures and the precautions for each stage of work will lead to problems such as poor compilation quality and lag in standard progress.This paper discusses the revision of the water conservancy standard compilation management method,compilation procedures and matters needing attention,which can provide reference for relevant personnel.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7