检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:温洪涌 WEN Hong-yong(China Nuclear Power Engineering Design Co.,Ltd.,Shenzhen,Guangdong 518172,China)
机构地区:[1]深圳中广核工程设计有限公司,广东深圳518172
出 处:《中国港湾建设》2022年第11期30-33,共4页China Harbour Engineering
摘 要:某核电厂取水北防波堤段设计拟采用直立式和斜坡式2种结构方案,为了深入分析2种结构形式对泵房前池波高的影响程度,通过波浪整体物理模型试验,研究不同结构形式的防波堤在各向波浪作用下,泵房前池波高的变化情况。通过优化试验,在取水明渠前端设置挡浪设施,以降低泵房前池波高;同时,采用经验模态分解(EMD)方法对前池波动进行分离,结果表明泵房前池以长周期波动为主。The north breakwater of a nuclear power plant is designed to adopt two structural schemes of vertical type and slopetype.In order to in-depth analyze the influence of the two structural types on the wave height in the forebay of the pump house,physical model tests were carried out to analyze wave heights in the forebay of a pump house of different structural breakwatertypes under the action of various wave directions.Through optimization tests,wave blocking facilities were set up at the frontend of the open water intake channel to reduce the wave height in the forebay of the pump house.EMD method was used toseparate the fluctuation of waves in the forebay and the results show that the forebay of the pump house is subject to long periodfluctuation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.135.69