高原铁路水平定向试验孔施工概况和关键技术  被引量:9

Construction overview and key technology for the horizontal directional coring test hole on plateau railway

在线阅读下载全文

作  者:吴金生[1] 罗显粱 徐正宣[2] 刘建国[2] 黄晓林[1] 石绍云[1] 陈永东[3] 古学超 WU Jinsheng;LUO Xianliang;XU Zhengxuan;LIU Jianguo;HUANG Xiaolin;SHI Shaoyun;CHEN Yongdong;GU Xuechao(Institute of Exploration Technology,CAGS,Chengdu Sichuan 611734,China;China Railway Eryuan Engineering Group Co.Ltd.,Chengdu Sichuan 610031,China;Northwest Sichuan Geological Team,Sichuan Bureau of Geology and Mineral Resources,Mianyang Sichuan 621000,China)

机构地区:[1]中国地质科学院探矿工艺研究所,四川成都611734 [2]中铁二院工程集团有限责任公司,四川成都610031 [3]四川省地质矿产勘查开发局川西北地质队,四川绵阳621000

出  处:《钻探工程》2022年第6期1-7,共7页Drilling Engineering

基  金:中国地质调查局地质调查项目“复杂地层钻探关键技术智能升级与应用示范”(编号:DD20221652)。

摘  要:川藏铁路地处高原高寒高山峡谷地区,铁路隧道勘察十分艰难。开展了千米级水平绳索取心钻进技术与装备研发,在川藏铁路卡子拉山一号隧道DZ-卡子拉山一号-定向实验-01孔进行应用示范。成功完成1212 m水平定向试验钻孔,查明陡倾岩层3条断层和19处节理密集带,方位角偏差≤1°,孔斜0.76°/100 m,机械钻速3.09 m/h,台月效率350.29 m,创造国内水平绳索钻杆PQ、HQ深度588 m和974 m两项最新记录。攻克难进入地区钻孔无法搬迁和查明混杂陡倾岩层构造的难题,突破过去垂直“点”勘察变为水平“线”勘察,直观查明隧道洞身段地层岩性、陡倾岩层构造、水文地质条件等情况,为解决高原铁路长大深埋隧道勘察难题提供了借鉴,具有示范与推广作用。The Sichuan-Tibet Railway is located in the high‑cold and alpine valley area of the plateau,and the railway tunnel survey is very difficult.The author has carried out the research and development of 1000m‑level horizontal wireline coring drilling technology and equipment,and conducted application demonstration in the DZ-Kazila Mountain No.1-Directional Experiment-01 hole of the Kazila Mountain No.1 Tunnel on the Sichuan-Tibet Railway.The 1212m horizontal directional test hole was successfully completed,and 3 faults and 19 joint fractured zones in steep dip strata were identified.The error in azimuth was less than 1°,the hole inclination was 0.76°/100m,the mechanical drilling ratewas 3.09m/h,and the rig‑month efficiency was 350.29m,which created two depth records of 588m and 974m each for PQ and HQ sizes in China.The difficulties on transportation in inaccessible areas and on identification of the structure of mixed steeply inclined rock formations were overcome,and breakthrough was made with horizontal“line”surveys in place of the past vertical“point”surveys.With the horizontal directional coring hole,rock lithology,high dip formation structure,and hydrology at the tunnel section can be directly identified.It can provide a reference for solving the difficult exploration of long and deep buried tunnels on plateau railway;and has the role of demonstration and promotion.

关 键 词:高原铁路 川藏铁路 隧道勘察 水平定向孔 绳索取心 钻探关键技术 示范工程 

分 类 号:P634.7[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象