检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:焦若珂 JIAO Ruoke(Gucheng Coal Mine,Shanxi Lu'an Mining(Group)Co.,Ltd.,Changzhi 046100,China)
机构地区:[1]山西潞安矿业(集团)有限责任公司古城煤矿,山西长治046100
出 处:《煤》2022年第12期25-27,共3页Coal
摘 要:司马煤业为解决地表建筑压覆资源问题,预采用连采连充技术对一采区压覆资源进行充填开采试验。文章设计在一采区布设首个连采连充工作面1116.1116连采连充工作面通过现有开拓大巷向东延伸出的3条准备巷道沟通各个生产系统;工作面由4条巷道组成,采用“W”型巷道布置方式,通过方案比较和理论计算得出了充填开采条带的长度和宽度。In order to solve the problem of surface building overburden resources, Sima Coal Industry adopts continuous mining and filling technology to carry out filling mining test of overburden resources in No.1 mining area. In this paper, the first continuous mining and charging working face 1116.1116 continuous mining and charging working face is designed to communicate each production system through three preparatory roadways extending eastward from the existing opening main roadway in the first mining area. The working face is composed of 4 roadways, and the “W” roadways are adopted. The length and width of the backfill mining strip are obtained through scheme comparison and theoretical calculation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15