检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李攀[1] 杨正坤 花海南 凌列栋 LI Pan;YANG Zheng-kun;HUA Hai-nan;LING Lie-dong(China Construction Eighth Engineering Bureau Co.,Ltd.,Shaoxing 312000,China)
机构地区:[1]中国建筑第八工程局有限公司,绍兴312000
出 处:《价值工程》2022年第33期97-99,共3页Value Engineering
摘 要:地下室抗浮常见的措施有增加底板配重、抗浮桩和抗浮锚杆,抗浮锚杆相对于前两种措施具有造价低、施工方便和受力合理等诸多优点。但是,抗浮锚杆容易出现的问题就是防水节点易渗漏。本文以绍兴市某项目基础底板抗浮施工为依托,对原有抗浮锚杆防水节点的设计进行了优化,最终结果表明,优化后的防水做法既保证了防水的效果,提高了施工效率,还为项目大大节省了施工成本。The common anti floating measures for basement are to increase the floor weight,anti floating pile and anti floating anchor bolt.Compared with the first two measures,anti floating anchor bolt has many advantages such as low cost,convenient construction and reasonable stress.However,the problem that anti floating anchor is easy to appear is that waterproof joints are easy to leak.Based on the anti floating construction of the foundation slab of a project in Shaoxing,this paper optimizes the design of the original anti floating anchor waterproof node.The final result shows that the optimized waterproof method not only ensures the waterproof effect,improves the construction efficiency,but also saves the construction cost for the project.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7