检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭鸿鹅 王文彬 吴仕虎 GUO Hong-e;WANG Wen-bin;WU Shi-hu(Yunnan United Electric Power Development Co.,Ltd.,Ruili 678600,China)
机构地区:[1]云南联合电力开发有限公司,云南瑞丽678600
出 处:《云南水力发电》2022年第11期225-229,共5页Yunnan Water Power
摘 要:阐述了对于高水头、高转速,过机水流中泥沙含量即高又硬的水电站,在电站设计、水轮机设计、选型制造时应该充分考虑到由此引发的问题,并通过水库的综合调度、泥沙排泄,优化机组结构和采用抗磨蚀材料防护等措施来提高机组的可靠性,延长检修周期。瑞丽江电站的水轮机部件经过10+a的研究分析、技术改造,已大大提高了机组的可靠性、可利用小时数,且延长了机组检修周期,既保证了机组的长周期安全稳定运行,也降低了机组检修的直接成本和间接成本。For hydropower stations with high water head,high speed,and high and hard sediment content in turbine flow,the problems arising therefrom shall be fully considered in the design of power station,design of hydraulic turbine,and selection and manufacture.The reliability of the unit is improved and the maintenance period is extended through the comprehensive dispatching of the reservoir,sediment discharge,optimization of the unit structure and the use of anti-abrasion materials.After more than ten years of research,analysis and technical transformation,the turbine components of Ruilijiang Hydropower Station have greatly improved the reliability of the unit,the number of available hours and the maintenance period of the unit.It not only ensures the long-term safe and stable operation of the unit,but also reduces the direct and indirect costs of unit maintenance.
分 类 号:TV734.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49