竖井联系测量在武山铜矿项目中的应用分析  

Application Analysis of Shaft Connection Survey in Wushan Copper Mine Project

在线阅读下载全文

作  者:欧阳东生 Ouyang Dongsheng(Guangdong Nonferrous Geological Surveying and Mapping Institute,Guangzhou Guangdong 510080)

机构地区:[1]广东省有色地质测绘院,广东广州510080

出  处:《山西冶金》2022年第7期154-157,161,共5页Shanxi Metallurgy

摘  要:近年来,随着我国矿山事业的不断发展,矿产资源也成为我国经济高速发展的重要资源之一。但由于矿山开采存在较多的不确定性、且工序繁多、复杂,具有较强的风险,传统的测量技术无法满足当前矿山测量的实际需求。为了确保矿山资源顺利开采、矿井能够贯通,还需采用竖井联系测量。该测量方法能够有效将地面控制网的坐标、方位、高程按要求传递给井下导线,从而实现井上、井下坐标系统的统一,保证观测结果的精准。以武山铜矿工程项目竖井联系测量为例,通过对该工程项目竖井联测中存在的难点进行分析,并提出相应的竖井测量方案,以期能够有效提升矿井作业效率。In recent years,with the continuous development of China's mining industry,mineral resources have also become one of the important resources for China's rapid economic development.However,due to the uncertainty,complexity and risks in mining,the traditional surveying technology cannot meet the actual needs of current mine surveying.In order to ensure the smooth exploitation of mine resources and the mine can be connected,shaft connection survey is also required.This survey method can effectively transfer the coordinates,directions and elevations of the surface control network to the underground traverse as required,so as to achieve the unification of the underground and underground coordinate systems and ensure the accuracy of the observation results.Taking the shaft connection survey of Wushan Copper Mine Project as an example,this paper analyzes the difficulties in the shaft connection survey of this project,and puts forward the corresponding shaft measurement scheme,in order to effectively improve the mine operation efficiency.

关 键 词:武铜矿山 两井定向 竖井联测 方案 

分 类 号:TD175[矿业工程—矿山地质测量]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象