伊敏露天矿半连续工艺开采参数优化研究  被引量:2

Study on mining parameters optimization of semi-continuous process in Yimin Open-pit Mine

在线阅读下载全文

作  者:胡鹏飞 袁金祥 HU Pengfei;YUAN Jinxiang(Yimin Open-pit Mine,Huaneng Yimin Coal and Electricity Co.,Ltd.,Hulunbei'er 021134,China)

机构地区:[1]华能伊敏煤电有限责任公司伊敏露天矿,内蒙古呼伦贝尔021134

出  处:《露天采矿技术》2022年第6期11-13,共3页Opencast Mining Technology

摘  要:伊敏露天矿由于2020年的产能核增以及2021年煤炭保供,导致半连续系统和露天矿整体的推进出现不匹配的现象,主要表现为半连续系统的推进度低,导致内排土场空间释放受限,影响生产接续。为了将半连续系统的推进度与露天矿整体相互匹配,保证生产接续,对半连续系统的采矿参数包括台阶高度、工作线长度和采掘带宽度,进行优化研究。结果表明:当组合台阶高度为22 m,工作线长度在750~800 m时,半连续系统的推进度与露天矿整体能够相互匹配。Due to the production capacity increase in 2020 and coal supply guarantee in 2021 in Yimin Open-pit Mine,there is a mismatch between the overall propulsion of semi-continuous system and open-pit mine,mainly reflected in the low propulsion degree of semi-continuous system,which leads to limited space release of inner dump and affects production continuity.In order to match the propulsion degree of semi-continuous system with the whole open-pit mine and ensure the continuous production,the article studies mining parameters of semi-continuous system,including the height of steps,length of working line and width of mining zone.The results show that when the height of the composite step is 22 m and the length of the working line is between 750~800 m,the propulsion degree of the semi-continuous system can match the whole open-pit mine.

关 键 词:露天矿 半连续工艺 采掘带 台阶高度 工作线 

分 类 号:TD824[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象