检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李润 印传磊 翟万里[1] 张洪才[1] 林鹏[1] 许正周 Li Run;Yin Chuanlei;Zhai Wanli;Zhang Hongcai;Lin Peng;Xu Zhengzhou(Technology Center,Huaigang Special Steel Co.,Ltd.,Jiangsu Shagang Group,Huai’an 223002)
机构地区:[1]江苏沙钢集团淮钢特钢股份有限公司技术中心,淮安223002
出 处:《特殊钢》2022年第6期95-100,共6页Special Steel
摘 要:为研究90 t BOF-RH-LF-CC流程生产的超低碳钢AISI1006夹杂物控制情况,通过对200 mm×200 mm铸坯横断面不同位置夹杂物进行统计分析,结果表明:钢中小颗粒夹杂占比较大,尺寸5~10μm的夹杂物占比达到91.0%,10~13μm的占比3.6%,13μm以上占比5.4%。尺寸较大夹杂主要分布于铸坯中心。在铸坯1/4边长处夹杂物分布最多,其次是近中心处,铸坯近表面处夹杂物最少。铸坯内夹杂物主要为Al_(2)O_(3)、Al_(2)O_(3)·CaO·(CaS·MnS)、Al_(2)O_(3)·CaO·MgO·(CaS·MnS)、MgO·Al_(2)O_(3)·(CaS·MnS)复合夹杂物,为内生夹杂物。开展工艺优化改进,RH高真空保持时间控制在15 min以上,LF精炼做好脱氧造渣及脱硫,精炼时间控制在90 min以内,精炼终渣碱度在6~7,出站前喂入硅钙线进行变性处理,软吹时间控制在25 min以上,连铸做好保护浇注,中间包开大氩气流量吹扫10 min以上,避免二次氧化,将夹杂物往钙铝酸盐方向控制,工艺优化后,钢水T.O含量≤20×10^(-6),B、D、Ds夹杂级别≤1.0。In order to study the control of 90 t BOF-RH-LF-CC flowsheet produced ultra-low carbon steel AISI 1006 inclusions,the sample was taken at different sampling point at cross section of 200 mm×200 mm cast bloom to analyze inclusious,the analysis results show that the ratio of inclusions of small particles in the steel are relatively large,and the inclusions with size of 5-10μm accounted for 90.1%,3.6%of the 10-13μm,and 5.4%above 13μm,and the larger size inclusions are mainly distributed in the center of the casting bloom.The largest distribution of inclusions is at the length of side 1/4 of the cast billet,followed by the near center,and the least inclusions near the surface of the cast bloom.The inclusions in the casting bloom are mainly Al_(2)O_(3),Al_(2)O_(3)·CaO·(CaS·MnS),Al_(2)O_(3)·CaO·MgO·(CaS·MnS),MgO·Al_(2)O_(3)·(CaS·MnS)composite inclusions,which are endogenous inclusions.The process optimization is carried out,RH high vacuum holding time is controlled for more than 15 minutes,Deoxygenation slagging and desulfurization be controlled well duing LF refining,the refining time is controlled for within 90 minutes,the alkalinity of the refining final slag is 6 to 7,the silicon calcium line is fed before leaving the station for modification treatment,the soft blowing time is controlled for more than 25 minutes,the continuous casting is well protected,the tundish large argon flow is purged for more than 10 minutes to avoid the secondary oxidation,the inclusions are controlled in the direction of calcium aluminate,and the T.O content of molten steel is reduced,after process optimization,T.O content of mloren steel≤20×10^(-6),rate of B、D、Ds inclusion≤1.0.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.171.222