检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Ali ALAJMI Hosny ABOU-ZIYAN Hamad H.Al-MUTAIRI
机构地区:[1]Mechanical Engineering Department,College of Technological Studies,PAAET,Kuwait [2]Mechanical Power Engineering Department,Faculty of Engineering,Helwan University,Cairo,Egypt
出 处:《Frontiers in Energy》2022年第4期629-650,共22页能源前沿(英文版)
基 金:funded by the Public Authority for Applied Education and Training(PAAET)under project number TS-08-14.
摘 要:This paper attempts to resolve the reported contradiction in the literature about the characteristics of high-performance/cost-effective fenestration of residential buildings,particularly in hot climates.The considered issues are the window glazing property(ten commercial glazing types),facade orientation(four main orientations),window-to-wall ratio(WWR)(0.2–0.8),and solar shading overhangs and side-fins(nine shading conditions).The results of the simulated runs reveal that the glazing quality has a superior effect over the other fenestration parameters and controls their effect on the energy consumption of residential buildings.Thus,using low-performance windows on buildings yields larger effects of WWR,facade orientation,and solar shading than high-performance windows.As the WWR increases from 0.2 to 0.8,the building energy consumption using the low-performance window increases 6.46 times than that using the highperformance window.The best facade orientation is changed from north to south according to the glazing properties.In addition,the solar shading need is correlated as a function of a window-glazing property and WWR.The cost analysis shows that the high-performance windows without solar shading are cost-effective as they have the largest net present cost compared to lowperformance windows with or without solar shading.Accordingly,replacing low-performance windows with high-performance ones,in an existing residential building,saves about 12.7 MWh of electricity and 11.05 tons of CO_(2) annually.
关 键 词:parametric analysis high-performance window window-to-wall ratio(WWR) facade orientation solar shading cost analysis
分 类 号:TK01[动力工程及工程热物理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3