关于工程量计算中易失误点原因产生及解决措施分析  被引量:1

Analysis on Causes and Solutions of Easy to Miss Points in Quantity Calculation

在线阅读下载全文

作  者:王凌超 Wang Lingchao(Jiangsu Geological Pile Engineering Company,Zhenjiang,212000)

机构地区:[1]江苏地质基桩工程公司,镇江212000

出  处:《建设科技》2022年第21期103-106,共4页Construction Science and Technology

摘  要:工程量计算这一项工作贯穿于整个工程项目,是一项重要且容错率低的工作。在项目节奏越来越快的今天,分部分项工程越来越繁杂。算量工作中往往会出现一类看似粗心导致的失误,而出错的原因常常是算量对象未可视化及缺少相应的的核查措施等等。要解决这些易失误点,必须弄清症结所在,并采取合理的措施。The work of quantity calculation runs through the whole project,which is an important work with low fault tolerance.Today,the pace of the project is getting faster and faster,divisional and sub-divisional works are becoming more and more complicated.There is often a kind of mistake caused by carelessness in the calculation work,the reason for the error is often that the calculation object is not visualized and the corresponding verification measures are lacking.In order to solve these"easy to miss points",causes must be found out and reasonable measures need be taken.

关 键 词:工程量计算 可视化 核查措施 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象