建筑材料价差调整办法的实际应用——以某水利项目为例  被引量:5

Practical Application of Price Difference Adjustment Method for Building Materials:Taking a Water Project as an Example

在线阅读下载全文

作  者:吴霄 汤孟刚 WU Xiao;TANG Menggang(Power China,Northwest Engineering Corporation Limited,Xi’an 710065,China;Longwill Project Management Consulting Corporation Limited,Xi’an 710065,China)

机构地区:[1]中国电建集团西北勘测设计研究院有限公司,陕西西安710065 [2]龙寰项目管理咨询有限公司,陕西西安710065

出  处:《建筑经济》2022年第12期69-76,共8页Construction Economy

摘  要:建筑材料费在水利工程造价中费用占比较大,其价格波动会影响发承包双方利益,甚至关系到工程能否顺利完工。本文采用三种价差调整办法进行水利工程建筑材料价差测算,对价差调整的边界条件、计算过程及计算结果进行了详细介绍,并对调差方法的适用性做了简要分析,以期对其他项目的调差工作提供参考。The cost of building materials accounts for a large proportion of the cost of water projects,and its price fluctuation will affect the interests of both parties,even related to the smooth completion of the project.In this paper,three methods of price difference adjustment are used to measure the price difference of hydraulic engineering building materials.The boundary conditions,calculation process and calculation results of price difference adjustment are introduced,and the applicability of the adjustment method is briefly analyzed in order to provide reference for the adjustment work of other projects.

关 键 词:价差调整 建筑材料 水利项目 

分 类 号:TU723.3[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象