检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张重阳 ZHANG Chong-yang(School of Architecture and Civil Engineering,Huanghuai University,Zhumadian 463000,Henan,China)
机构地区:[1]黄淮学院建筑工程学院,河南驻马店463000
出 处:《广东交通职业技术学院学报》2022年第4期57-61,共5页Journal of Guangdong Communication Polytechnic
摘 要:随着桥梁使用年限的增加,各种荷载组合作用以及施工过程中的误差,导致部分桥梁出现不同程度的损伤和病害。本文结合某多跨预应力混凝土连续T梁桥的工程案例,分析该桥出现梁体滑移的主要原因,并通过建立有限元模型进行桩柱结构受力验算,针对桥梁不同部位的病害提出有效的处治措施,从而保证桥梁的正常运营,为今后其他桥梁维修加固提供参考依据。With the increasing service life of the bridges,various load combinations and errors during construction lead to different degrees of damage and diseases in some bridges.Based on the engineering case of a multi-span pre-stressed concrete continuous T-beam bridge,the main reasons of the beam slippage are analyzed,and the finite element model is established to check the stress of pile-column structure,and puts forward effective treatment measures for the diseases of different parts of the bridge,so as to ensure the normal operation of the bridge and provides reference for the maintenance and reinforcement of other bridges in the future.
分 类 号:U445.7[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.190