检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李利琴 倪菲菲 周晓丽 李玉娜[3] 张向萍 LI Liqin;NI Feifei;ZHOU Xiaoli;LI Yuna;ZHANG Xiangping(Henan Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou 450003,China;Zhengzhou Institute of Environmental Protection Science,Zhengzhou 450052,China;Zhengzhou Electric Power College,Zhengzhou 450000,China;Yellow River Institute of Hydraulic Research,Zhengzhou 450003,China)
机构地区:[1]河南黄河勘测规划设计研究院有限公司,河南郑州450003 [2]郑州市环境保护科学研究所,河南郑州450052 [3]郑州电力高等专科学校,河南郑州450000 [4]黄河水利科学研究院,河南郑州450003
出 处:《人民黄河》2022年第12期42-46,共5页Yellow River
基 金:河南省自然科学基金面上项目(212300410372)。
摘 要:为调整改善河南黄河河道不利河势、拓宽局部窄河段、减小工程出险概率,在现有河道整治工程布局的基础上,提出了河道整治疏浚措施,配合河道整治工程共同发挥作用,解决不利河势问题,减轻防洪抢险压力,实现安全度汛。通过分析河南黄河河道存在的问题,结合河势变化及工程出险情况,分析确定疏浚河段;制定疏浚不超过规划治导线等原则,针对不同疏浚河段的具体情况,确定疏浚平面布置及疏浚控制高程等参数;针对疏浚实施作用,结合不同河段情况进行具体分析。研究表明:现状河道条件下,因势利导实施疏浚作为河道整治工程的有机补充,是解决河南黄河不利河势问题的有效措施,同时也是落实黄河流域生态保护和高质量发展规划纲要的具体行动。In order to adjust and improve the unfavorable river regime for the wandering reaches in Henan section of the Yellow River,widen the local narrow reaches and reduce the probability of engineering dangers,based on the existing layout of the river training works,river training and dredging measures were proposed.Cooperating with river training works,complement each other and play a role together to solve the issue of unfavorable river regime,so as to reduce the pressure of flood control and rescue,and realize the security of flood control in the future.By analyzing the existing problems of the wandering section in Henan Province,combined with the changes of the river situation and the accident situation of the project,the dredging section was analyzed and determined.Formulate the principle that dredging should not ex⁃ceed the planning control line.According to the specific conditions of different river dredging sections,determined the dredging plane layout,dredging control elevation and other parameters,and analyzed the effect of dredging implementation in combination with the conditions of dif⁃ferent river sections.The research results show that the implementation of dredging for wandering section in Henan section of the Yellow Riv⁃er,as an organic supplement to the river training works,is an effective measure to solve the issue of unfavorable river regime according to the situation under the current river conditions,which is also a specific action to implement the outline of the ecological protection and high⁃qual⁃ity development plan in the Yellow River Basin.
分 类 号:TV851[水利工程—水利水电工程] TV882.1
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7